Charleston Harbor Deepening Awaits Approval from Congress

Charleston Harbor waiting authorization from Congress for deepening.
1 minute reading time (67 words)

ANAMAR Crew Completes Assessment of the Columbia River ODMDS

ANAMAR Crew Completes Assessment of the Columbia River ODMDS

ANAMAR scientists have been working off the coast of Oregon at the mouth of the Columbia River monitoring the chemical, physical, and biological aspects of an ocean dredged material disposal site (ODMDS). Part of the goal for this project was to calculate the health and abundance of epifauna and infauna in the area, including an important species, the Dungeness crab.

Pictured is the crew preparing crab traps.

Alachua County Ranks in Top 10 in Florida’s 2013 T...
Tropical Storm Arthur Breezes up the East Coast

Related Posts

 

Comments

Already Registered? Login Here
No comments made yet. Be the first to submit a comment

©2006-2016 ANAMAR Environmental Consulting, Inc. | Web design & hosting provided by Blu Dove Designs

Gainesville, FL (352) 377-5770
Portland, OR (503) 220-1641
Fax: (352) 378-7620 • This email address is being protected from spambots. You need JavaScript enabled to view it.